top of page

Process Water Pump Upgrade for Efficiency & Reliability
Two industrial process water pumps were experiencing frequent failures due to being incorrectly specified for the required duty.
The solution involved replacing both with larger pumps, running at slower speeds and controlled by inverters to maintain precise pressure. The new pumps and motors were mounted on precision alignment bases to ensure optimal performance and longevity.
This upgrade delivered a significant energy saving, alongside a major reliability improvement — with pump maintenance intervals now extended by 5 to 6 times, compared to the previous setup.
Savings
Client Testimonials
"From understanding legal requirements of ESOS and EED the professional was able to design, instruct and have 42 reports completed across the EU and UK. The regulators confirmed the company was in compliance. The board was then able to prioritise necessary investment."
Christina Stapis, DNV Ltd.
"We've partnered on countless successful projects with great collaboration, consistently strong technical contributions, and drive to get projects over the finishing line. The outcomes have been a testament to the power of teamwork and execution. We look forward to our next project."
Anthony Marshall, ECAD Engineering Ltd.
Gallery
bottom of page










